NEXT 1/80

Architects

Chewing Gum Factory: het lab

Type: offices Location: Amsterdam Client: Lingotto Team: Bart Reuser, Marijn Schenk, Michel Schreinemachers, Joost Lemmens, Agata Piet, Ines Meuws Floor area / size: 3000m2 Contractor: Theuns Construction: Strackee Installations: Bulters&Bulters Start building: 2009-08-15 Completion: 2010-01-01 Status: completed

2010-06-07 Containers placed 2010-02-25 Femke Halsema and Maarten van Poelgeest open 'HET LAB'

The Chewing Gum Factory: ‘THE LAB’ is a project initiated by Lingotto Vastgoed bv. The purchase of an industrial building of 3000m2 from the ‘50 at the Willem Fenengastraat 2 was the start of a metamorphosis. The building consists of 3 large halls of approximately 600m2 in open connection with each other and an office area with 3 floors. The main bearing structure consists of a concrete frame and concrete floors. The facades are made of masonry.

The assignment is twofold: first, the design of an overall concept for the office section and secondly the transformation of the 3 large halls in rentable office for creative businesses.
The land surrounding the building is also included in the development and will provide the offices with parking lots and outdoor spaces.



NEXT ARCHITECTS
P.van Vlissingenstr 2a
1096 BK Amsterdam
THE NETHERLANDS
P +31 (0)20 4630463
F +31 (0)20 3624745

send mail
CHINA
66 Nanlishi Rd
Haidian District
Beijing  CHINA
P +86 (0)10 68080130
F +86 (0)10 68080139

visit website