NEXT 1/71

Architects

IBM office and research center

Location: ZPARK Beijing Client: Beijing Century Real Estate Team: John van de Water with Chen Song, Wopke Schaafstal, Lui Gui Feng, Li Gui Feng and Bart Reuser, Marij Floor area / size: 55.000 m2 Start building: august 2007

2008-05-10 Sneak preview 2007-11-10 Construction at full speed 2007-08-07 Construction started

This IBM research-office building is situated in a new, green IT-development zone in North-west Beijing. The given site is elliptical and according to the urban plan, buildings are to be single entities. IBM aims to provide a healthy working environment, as part of their vision to provide a productive environment.

To maximize the building area, the building envelop follows the site restrictions and therefore is elliptically shaped. To stimulate a healthy environment, the building aims to maximize its relations with its green surrounding landscape.  

As such, the building consists of one two-story ellipse that rests on four smaller ellipses. The top two floors contain offices; the collective program is concentrated in the smaller ellipses.

The meandering space between the ground floor ellipses opens up towards the surrounding landscapes and accommodates the central lobby and three internal gardens.



NEXT ARCHITECTS
P.van Vlissingenstr 2a
1096 BK Amsterdam
THE NETHERLANDS
P +31 (0)20 4630463
F +31 (0)20 3624745

send mail

Chuang Jing Da
Sha 4F
38 ShouTi Nan Lu
Beijing  CHINA
P +86 (0)10 58892111
F +86 (0)10 58892255

visit website